{"id":17944,"date":"2026-09-29T06:50:25","date_gmt":"2026-09-29T01:20:25","guid":{"rendered":"https:\/\/johnsonfrancis.org\/techworld\/?p=17944"},"modified":"2026-09-29T06:50:27","modified_gmt":"2026-09-29T01:20:27","slug":"how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts","status":"publish","type":"post","link":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/","title":{"rendered":"How is the power of data centers calculated in Giga Watts and Tera Watts?"},"content":{"rendered":"<iframe loading=\"lazy\" width=\"560\" height=\"315\" src=\"https:\/\/www.youtube.com\/embed\/l7HAn2kyslI?si=rJUPHzOlq7V6Rilj\" title=\"YouTube video player\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n\n<p class=\"wp-block-paragraph\">When discussing power of computing facilities in <strong>Gigawatts (GW)<\/strong> (10<sup>9<\/sup> watts) or <strong>Terawatts (TW)<\/strong> (10<sup>12<\/sup> watts), you are measuring <strong>electrical power consumption<\/strong>, not computational performance. Computational performance is typically measured in <strong>FLOPs<\/strong> (Floating-Point Operations Per Second), while Gigawatts and Terawatts measure the sheer amount of electrical energy required to run and cool those computing systems.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Connecting Compute Performance to Power Draw<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">To calculate how much electrical power (in Watts, kilowatts, or Gigawatts) a computing system requires, engineers look at <strong>energy efficiency<\/strong>, expressed as <strong>FLOPs per Watt<\/strong>. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The basic formula to estimate power consumption from performance is:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Power (Watts) = [Total Compute Performance (FLOPs)]\/[Energy Efficiency (FLOPs\/Watt)<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Example:<\/strong> If a hypothetical supercomputer or AI training cluster delivers 1 ExaFLOPS (10<sup>18<\/sup> FLOPs) of performance, and its efficiency is 50 GigaFLOPS per Watt (5 x 10<sup>10<\/sup> FLOPs\/W), its core processing hardware would draw:<br>\n<ul class=\"wp-block-list\">\n<li>10<sup>18<\/sup>\/(5 x 10<sup>10<\/sup>)= 20,000,000 Watts = 20 Megawatts (MW)<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">2. Scaling Up: Data Centers, Gigawatts, and Terawatts<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">As AI models and high-performance computing (HPC) clusters grow larger, single facilities and global networks require power scales measured in Gigawatts and heading toward Terawatts. Calculating total facility power involves accounting for more than just the chips:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>IT Load:<\/strong> The power consumed directly by the servers, GPUs, CPUs, memory, and networking gear.<\/li>\n\n\n\n<li><strong>Cooling and Infrastructure Overhead:<\/strong> Power consumed by chillers, fans, pumps, power distribution units (PDUs), and backup systems.<\/li>\n\n\n\n<li><strong>PUE (Power Usage Effectiveness):<\/strong> The industry standard metric defined as:<br>\n<ul class=\"wp-block-list\">\n<li>PUE = Total Facility Energy\/IT Equipment Energy<\/li>\n\n\n\n<li>An ideal PUE is 1.0 (meaning zero overhead), though modern efficient data centers typically operate around 1.1 to 1.2, while older facilities might be 1.5 or higher.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">To calculate the <strong>Total Facility Power (in GW)<\/strong>:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Total GW = [IT Load (GW) x PUE]\/1,000  (or adjusted for scale)<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">3. What Do GW and TW Look Like in the Real World?<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Megawatts (MW):<\/strong> A typical large enterprise data center consumes between <strong>10 MW to 100 MW<\/strong> of power.<\/li>\n\n\n\n<li><strong>Gigawatts (GW):<\/strong> Emerging hyperscale AI clusters and multi-tenant data center campuses are beginning to demand <strong>1 GW to several GW<\/strong> of continuous power (roughly equivalent to the output of a large nuclear or coal-fired power plant).<\/li>\n\n\n\n<li><strong>Terawatts (TW):<\/strong> While no single facility reaches a Terawatt, the <em>cumulative global energy consumption<\/em> of all data centers, telecommunications networks, and cryptocurrency mining worldwide is projected to approach significant fractions of a Terawatt as AI adoption scales globally.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>When discussing power of computing facilities in Gigawatts (GW) (109 watts) or Terawatts (TW) (1012 watts), you are measuring electrical power consumption, not computational performance. Computational performance is typically measured in FLOPs (Floating-Point Operations Per Second), while Gigawatts and Terawatts measure the sheer amount of electrical energy required to run and cool those computing systems. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":17947,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-17944","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-amateur-radio-ham-radio"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How is the power of data centers calculated in Giga Watts and Tera Watts? - Johnson&#039;s Techworld<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How is the power of data centers calculated in Giga Watts and Tera Watts? - Johnson&#039;s Techworld\" \/>\n<meta property=\"og:description\" content=\"When discussing power of computing facilities in Gigawatts (GW) (109 watts) or Terawatts (TW) (1012 watts), you are measuring electrical power consumption, not computational performance. Computational performance is typically measured in FLOPs (Floating-Point Operations Per Second), while Gigawatts and Terawatts measure the sheer amount of electrical energy required to run and cool those computing systems. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/\" \/>\n<meta property=\"og:site_name\" content=\"Johnson&#039;s Techworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-29T01:20:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-29T01:20:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/johnsonfrancis.org\/techworld\/wp-content\/uploads\/2026\/09\/How-is-the-power-of-data-centers-calculated-in-Giga-Watts-and-Tera-Watts.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1285\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Johnson Francis\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Johnson Francis\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\\\/\"},\"author\":{\"name\":\"Johnson Francis\",\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/#\\\/schema\\\/person\\\/6201c843e80ccd3578e6196b1d007027\"},\"headline\":\"How is the power of data centers calculated in Giga Watts and Tera Watts?\",\"datePublished\":\"2026-09-29T01:20:25+00:00\",\"dateModified\":\"2026-09-29T01:20:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\\\/\"},\"wordCount\":386,\"publisher\":{\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/#\\\/schema\\\/person\\\/6201c843e80ccd3578e6196b1d007027\"},\"image\":{\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/How-is-the-power-of-data-centers-calculated-in-Giga-Watts-and-Tera-Watts.jpg\",\"articleSection\":[\"Amateur Radio (Ham Radio)\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\\\/\",\"url\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\\\/\",\"name\":\"How is the power of data centers calculated in Giga Watts and Tera Watts? - Johnson&#039;s Techworld\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/How-is-the-power-of-data-centers-calculated-in-Giga-Watts-and-Tera-Watts.jpg\",\"datePublished\":\"2026-09-29T01:20:25+00:00\",\"dateModified\":\"2026-09-29T01:20:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\\\/#primaryimage\",\"url\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/How-is-the-power-of-data-centers-calculated-in-Giga-Watts-and-Tera-Watts.jpg\",\"contentUrl\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/How-is-the-power-of-data-centers-calculated-in-Giga-Watts-and-Tera-Watts.jpg\",\"width\":1285,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How is the power of data centers calculated in Giga Watts and Tera Watts?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/#website\",\"url\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/\",\"name\":\"Johnson's Techworld\",\"description\":\"Johnson&#039;s Techworld\",\"publisher\":{\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/#\\\/schema\\\/person\\\/6201c843e80ccd3578e6196b1d007027\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Person\",\"Organization\"],\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/#\\\/schema\\\/person\\\/6201c843e80ccd3578e6196b1d007027\",\"name\":\"Johnson Francis\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/channels4_profile.jpg\",\"url\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/channels4_profile.jpg\",\"contentUrl\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/channels4_profile.jpg\",\"width\":600,\"height\":600,\"caption\":\"Johnson Francis\"},\"logo\":{\"@id\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/channels4_profile.jpg\"},\"description\":\"Amateur Radio Operator VU2JO. Originally licensed as VU2JFP with Grade 1 license in 1985. Upgraded to Advanced Grade in 1988 and was allotted new callsign to VU2JO\",\"sameAs\":[\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\",\"https:\\\/\\\/www.youtube.com\\\/@johnsonstechworld\\\/\"],\"url\":\"https:\\\/\\\/johnsonfrancis.org\\\/techworld\\\/author\\\/jf\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How is the power of data centers calculated in Giga Watts and Tera Watts? - Johnson&#039;s Techworld","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/","og_locale":"en_US","og_type":"article","og_title":"How is the power of data centers calculated in Giga Watts and Tera Watts? - Johnson&#039;s Techworld","og_description":"When discussing power of computing facilities in Gigawatts (GW) (109 watts) or Terawatts (TW) (1012 watts), you are measuring electrical power consumption, not computational performance. Computational performance is typically measured in FLOPs (Floating-Point Operations Per Second), while Gigawatts and Terawatts measure the sheer amount of electrical energy required to run and cool those computing systems. [&hellip;]","og_url":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/","og_site_name":"Johnson&#039;s Techworld","article_published_time":"2026-09-29T01:20:25+00:00","article_modified_time":"2026-09-29T01:20:27+00:00","og_image":[{"width":1285,"height":720,"url":"https:\/\/johnsonfrancis.org\/techworld\/wp-content\/uploads\/2026\/09\/How-is-the-power-of-data-centers-calculated-in-Giga-Watts-and-Tera-Watts.jpg","type":"image\/jpeg"}],"author":"Johnson Francis","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Johnson Francis","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/#article","isPartOf":{"@id":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/"},"author":{"name":"Johnson Francis","@id":"https:\/\/johnsonfrancis.org\/techworld\/#\/schema\/person\/6201c843e80ccd3578e6196b1d007027"},"headline":"How is the power of data centers calculated in Giga Watts and Tera Watts?","datePublished":"2026-09-29T01:20:25+00:00","dateModified":"2026-09-29T01:20:27+00:00","mainEntityOfPage":{"@id":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/"},"wordCount":386,"publisher":{"@id":"https:\/\/johnsonfrancis.org\/techworld\/#\/schema\/person\/6201c843e80ccd3578e6196b1d007027"},"image":{"@id":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/#primaryimage"},"thumbnailUrl":"https:\/\/johnsonfrancis.org\/techworld\/wp-content\/uploads\/2026\/09\/How-is-the-power-of-data-centers-calculated-in-Giga-Watts-and-Tera-Watts.jpg","articleSection":["Amateur Radio (Ham Radio)"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/","url":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/","name":"How is the power of data centers calculated in Giga Watts and Tera Watts? - Johnson&#039;s Techworld","isPartOf":{"@id":"https:\/\/johnsonfrancis.org\/techworld\/#website"},"primaryImageOfPage":{"@id":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/#primaryimage"},"image":{"@id":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/#primaryimage"},"thumbnailUrl":"https:\/\/johnsonfrancis.org\/techworld\/wp-content\/uploads\/2026\/09\/How-is-the-power-of-data-centers-calculated-in-Giga-Watts-and-Tera-Watts.jpg","datePublished":"2026-09-29T01:20:25+00:00","dateModified":"2026-09-29T01:20:27+00:00","breadcrumb":{"@id":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/#primaryimage","url":"https:\/\/johnsonfrancis.org\/techworld\/wp-content\/uploads\/2026\/09\/How-is-the-power-of-data-centers-calculated-in-Giga-Watts-and-Tera-Watts.jpg","contentUrl":"https:\/\/johnsonfrancis.org\/techworld\/wp-content\/uploads\/2026\/09\/How-is-the-power-of-data-centers-calculated-in-Giga-Watts-and-Tera-Watts.jpg","width":1285,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/johnsonfrancis.org\/techworld\/how-is-the-power-of-data-centers-calculated-in-giga-watts-and-tera-watts\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/johnsonfrancis.org\/techworld\/"},{"@type":"ListItem","position":2,"name":"How is the power of data centers calculated in Giga Watts and Tera Watts?"}]},{"@type":"WebSite","@id":"https:\/\/johnsonfrancis.org\/techworld\/#website","url":"https:\/\/johnsonfrancis.org\/techworld\/","name":"Johnson's Techworld","description":"Johnson&#039;s Techworld","publisher":{"@id":"https:\/\/johnsonfrancis.org\/techworld\/#\/schema\/person\/6201c843e80ccd3578e6196b1d007027"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/johnsonfrancis.org\/techworld\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Person","Organization"],"@id":"https:\/\/johnsonfrancis.org\/techworld\/#\/schema\/person\/6201c843e80ccd3578e6196b1d007027","name":"Johnson Francis","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/johnsonfrancis.org\/techworld\/wp-content\/uploads\/2025\/01\/channels4_profile.jpg","url":"https:\/\/johnsonfrancis.org\/techworld\/wp-content\/uploads\/2025\/01\/channels4_profile.jpg","contentUrl":"https:\/\/johnsonfrancis.org\/techworld\/wp-content\/uploads\/2025\/01\/channels4_profile.jpg","width":600,"height":600,"caption":"Johnson Francis"},"logo":{"@id":"https:\/\/johnsonfrancis.org\/techworld\/wp-content\/uploads\/2025\/01\/channels4_profile.jpg"},"description":"Amateur Radio Operator VU2JO. Originally licensed as VU2JFP with Grade 1 license in 1985. Upgraded to Advanced Grade in 1988 and was allotted new callsign to VU2JO","sameAs":["https:\/\/johnsonfrancis.org\/techworld","https:\/\/www.youtube.com\/@johnsonstechworld\/"],"url":"https:\/\/johnsonfrancis.org\/techworld\/author\/jf\/"}]}},"_links":{"self":[{"href":"https:\/\/johnsonfrancis.org\/techworld\/wp-json\/wp\/v2\/posts\/17944","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/johnsonfrancis.org\/techworld\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/johnsonfrancis.org\/techworld\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/johnsonfrancis.org\/techworld\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/johnsonfrancis.org\/techworld\/wp-json\/wp\/v2\/comments?post=17944"}],"version-history":[{"count":5,"href":"https:\/\/johnsonfrancis.org\/techworld\/wp-json\/wp\/v2\/posts\/17944\/revisions"}],"predecessor-version":[{"id":17950,"href":"https:\/\/johnsonfrancis.org\/techworld\/wp-json\/wp\/v2\/posts\/17944\/revisions\/17950"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/johnsonfrancis.org\/techworld\/wp-json\/wp\/v2\/media\/17947"}],"wp:attachment":[{"href":"https:\/\/johnsonfrancis.org\/techworld\/wp-json\/wp\/v2\/media?parent=17944"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/johnsonfrancis.org\/techworld\/wp-json\/wp\/v2\/categories?post=17944"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/johnsonfrancis.org\/techworld\/wp-json\/wp\/v2\/tags?post=17944"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}